HOSPITALITY


RITZ-RESERVE AT CAROLINE BAY RESORT
Morgan’s Point, Bermuda


MEP/FP and Civil Engineering and Technology Infrastructure Design Services were provided. The Ritz-Reserve at Caroline Bay Resort includes: an approximately 40 acre site, 84 guest keys in 2-and-3-story casita buildings of 6 to 8 units each (15 total guestroom buildings), an arrival Building Complex with 3 restaurants and lounges, 2,500 SF function hall, reception area, retail, residence sales, kid’s center, a Spa Complex with indoor swimming pool, 2 outdoor swimming pools, fitness center, juice bar, locker rooms, and detached treatment rooms, 15,000 SF back of house services building, and hotel suites, and 2,500 SF golf cart charging and maintenance building. The Condominium units include: 147 condominium units, with 30 units to be a part of the hotel rental pool, 16 4-story building of 7 units each, one 8-story marina tower housing 35 units with retail at ground level, 600 SF residential arrival building, 2,500 SF residential clubhouse with dedicated pool, and numerous plunge pools for residences.


GREAT WOLF LODGE
LaGrange, GA


MEP/FP Engineering, Technology Infrastructure, and Water Features Design Services were provided. The Great Wolf Lodge LaGrange resort includes: a 400 key hotel with approximately 300,000 SF on 4 stories, a 21,000 SF conference center, a 60,000 SF lobby area with a dry play area, check-in, 2 restaurants and lounges, retail and amenities, and a 71,400 SF indoor water park. Our scope of work for the water park included: providing all potable water services for restrooms and concessions, providing utility connections to the design build portion of the space, and providing space air conditioning.


CONFIDENTIAL 5-STAR RESORT
Confidential Location, Caribbean


MEP/FP and Civil Engineering and Technology Infrastructure Design Services are being provided. This project, located on 320 hectares, includes: 175 guest key Hotel and Branded Residential of 50 keys, restaurants and lounges, meeting rooms, spa and fitness center, tennis courts, outdoor swimming pools, Golf Course Clubhouse and Maintenance Facility, a boat dock, heliport, entry house, and a Main Utility Compound, consisting of: Electrical Power Generation Facility, Water and Wastewater Treatment Plants, Operations and Control Center, Diesel fuel storage and dispensing, Gasoline storage and dispensing, Telecommunications Hub Building, Security Center, Solid Waste/Incinerator facility, and Water wells at various locations on the site at both north and south ends of the property.


JW MARRIOTT NASHVILLE
Nashville, TN


MEP/FP Engineering and Technology Infrastructure Design Services were provided. The 4-star JW Marriott includes: 533 guest keys totaling 464,879 SF, 33-stories, Bourbon Steak restaurant and lounge, rooftop bar, 50,000 SF of meeting space with 2 ballrooms, 2 boardrooms, and 16 meeting rooms, 3 levels of underground parking totaling 416,000 SF, spa, and fitness center.


JEDDAH HILTON HOTEL
Jeddah, Saudi Arabia


MEP/FP Engineering and Technology Infrastructure Design Services were provided. The Jeddah Hilton Hotel is a calm oasis in the hot desert. It boasts 450 keys, 27,000 square meter private residence, a 500 square meter mosque, 12,000 square meter function hall, 2 apartment buildings, 7 restaurants, swimming pool, fitness center, and tennis court. Work to design Phase II is to commence soon.


CONFIDENTIAL 5-STAR RESORT
Confidential Location, Caribbean


MEP/FP and Civil Engineering and Technology Infrastructure Design Services are being provided for a confidential resort in the Caribbean. This project includes: 120 “over the water” guest keys, wellness center and spa with hydrotherapy pool, Jacuzzi, and cold plunge pool, coffee plaza, gift shop and information center, restaurant and lounge, Pier Bar area, infinity edge outdoor swimming pool, Jacuzzi, and beach amenity areas including pool bar, towel and activity huts.


ATLANTIS RESORT AND CASINO, PHASE III
Paradise Island, Bahamas


MEP/FP and Civil Engineering and Technology Infrastructure and Water Features Design Services were provided. The resort includes: 1,200 guest keys throughout the Cove (Residential), and The Reef (All Suite Hotel) Resort, multiple restaurants, bars and lounges, Mandara Spa, Salon and Fitness Center, Support buildings for the Aqua-venture Waterpark with: water slides, river rapid rides, swimming pools, rock climbing wall, Dolphin Cay dolphin experience.

The Atlantis Complex is a complicated, large resort with very high utility costs that were overcome by employing a centralized utility plant with its inherent redundancy. With electrical cost at more than eight times that in the US and unreliable power from the local power company, a 100% Standby Power Generation System of fourteen megawatts was designed and built. Multiple unit interconnected chillers (7500 tons) and boilers (500 Hp), potable water and fire water centralized systems, all with self-contained pumping provided the remaining services.


ROSEWOOD WASHINGTON DC
Washington, DC


MEP/FP Engineering and Technology Infrastructure Design Services were provided for the Capella Georgetown. Our technology infrastructure design services for the Capella Georgetown, now the Rosewood Washington DC, were based on operator hotel design standards. We assisted the operator in the exploration and implementation of new technologies designed to modernize the guest experience. TEC provided all common backbone fiber distribution, fiber to the guestroom, fiber to the residence, audio/visual, guestroom controls/automation, MATV/CATV, distributed antennae systems (DAS), security, and CCTV security surveillance.


SANDALS EMERALD BAY RESORT AND CASINO
Grand Exuma, Bahamas


MEP/FP and Civil Engineering and Technology Infrastructure Design Services were provided for the Four Seasons Emerald Bay Resort and Casino. Now a Sandals Resort property, the Emerald Bay Resort is a luxury residential and resort community on 470 acres. Amenities include 217 villas and suites, 29,000 SF The Red Lane Spa and Fitness Center with 16 treatment rooms, 8 restaurants, bar and lounges, conference center, 270-slip deep water marina, casino, 4 swimming pools and 4 whirlpools, and a 7,200 yard championship golf course designed by Greg Norman, with accompanying clubhouse.


LOEWS PORTOFINO BAY RESORT
Orlando, FL


MEP/FP Engineering Services were provided. Modeled after the Portofino village in Italy, the Portofino Bay Hotel has European beauty in the heart of sunny Florida. The Portofino Bay Hotel includes: 750 guest keys, 45 suites, 8 restaurants and lounges, a Convention Center, Meeting Rooms, private bay with cabanas, 2 outdoor swimming pools, Mandara Spa and fitness center, retail shopping promenade, Bocce ball courts, and game room.


ONE&ONLY PALMILLA RESORT
Jose del Cabo, Mexico


MEP/FP and Civil Engineering Services were provided to Kerzner International. The One&Only Palmilla Resort in Mexico includes 172 guest keys, residential casas, 5 restaurants and lounges, spa, beauty parlor and fitness center, wedding chapel, ballroom, outdoor meeting facilities, 3 golf courses with 27 holes, outdoor swimming pool, and 2 hard tennis courts.


ONE&ONLY OCEAN CLUB RESORT
Paradise Island, Bahamas


MEP/FP and Civil Engineering Services were provided to Kerzner International. The exclusive One&Only resort in the Bahamas includes 105 guest keys, residential villas and cottages, 5 restaurants and lounges, spa and fitness center, outdoor meeting facilities, Tom Wieskopf’s 18-hole golf course, and 6 Har-Tru tennis courts.


MOHEGAN SUN RESORT AND CASINO
Uncasville, CT


MEP/FP Engineering Services were provided to the Mohegan Tribe. The Mohegan Sun is an impressive 34-story hotel and casino. This resort boasts 1,200 guest keys including 175 suites, a first-class 22,000 SF Elemis spa and salon, The Shops at Mohegan Sun 130,000 SF shopping pavilion, over 40 restaurants, lounges and food/beverage outlets, a fitness center, 10,000 SF indoor swimming pool and solarium, 18-hole championship golf course, over 30,000 SF casino space offering 3,000 game machines and 160 table games among 3 themed casinos (Casino of the Earth, Casino of the Sky and Casino of the Wind), Kids Quest and Cyber Quest children’s activity center and arcade, 350-seat Cabaret Theater, 300-seat Wolf Den Theater, over 100,000 SF of convention and meeting space including one of the largest ballrooms in the Northeast, and a 10,000-seat arena.


INTERCONTINENTAL BUCKHEAD
Atlanta, GA


MEP/FP Engineering Services were provided. The InterContinental Buckhead includes 21 stories, 400 guest keys, ballrooms, meeting rooms, restaurants, health club and other public areas totaling 378,000 SF. The garden plaza covers the 700 car parking deck.


HOTEL ARTS, BARCELONA
Barcelona, Spain


MEP/FP Engineering Services were provided for the Hotel Arts, Barcelona. The 154 meter tall Hotel Arts includes 44 stories, 483 guest keys including 56 executive suites, one Japanese suite, one Mediterranean Suite, 26 duplex Apartments, one Royal Suite and one Presidential Suite, 6 restaurants, bars and lounges, 3,000 square meters of function space, retail shops, outdoor swimming pool and hot tub, marina, Six Senses Spa, Salon and fitness center.

Thompson Ehle Company completed this hotel for use during the 1992 Barcelona Olympics and it is the listed as one of the Top 10 Celebrity Spotting Hotels in GAYOT.com.


HYATT GAINEY RANCH
Scottsdale, AZ


MEP/FP Engineering, Technology Infrastructure and Water Features Design Services were provided. The Gainey Ranch is situated in the picturesque Arizona desert, it boasts 500 keys, 33 suites, 6 restaurants and lounges, 3 27-hole golf courses, a spa, 10 swimming pools, whirlpools, tennis courts, 35,000 SF of indoor meeting space, 29 meeting rooms, and fitness center.


DISNEY’S BOARDWALK HOTEL
Lake Buena Vista, FL


MEP/FP Engineering Services were provided. Disney’s Boardwalk Hotel has the timeless charm of a 1930’s Atlantic coastal village. It boasts 524 keys, villas, 3 night clubs: the Atlantic Dance Hall, Jellyrolls, and ESPN Club, 4 restaurants, a 40,000 SF ballroom, 20,000 SF of function and meeting space, retail area for specialty stores, arcades, swimming pools, and tennis courts.


HYATT REGENCY HOUSTON/GALLERIA
Houston, TX


MEP/FP Engineering and Technology Infrastructure Design Services were provided for the Hyatt Regency located in the fast growing and upscale Galleria area in Houston, Texas. This full service hotel is comprised of 325 keys with 14 levels and includes a parking deck, restaurants, retail, fitness, pool, and conference center amenities.

The Hyatt Regency Houston Galleria was honored with the 2016 Landmark Award in the Hospitality category.


GOLDEN MOON HOTEL AND CASINO
Choctaw, MS


MEP/FP Engineering and Technology Infrastructure Design Services were provided to the Choctaw Indian Nation. The Golden Moon Hotel and Casino boasts 28-stories, 572 guest keys, 90,000 SF casino floor with 2,100 slot machines, 27,000 SF of public area, 44,000 SF shopping promenade, 46,000 SF show theatre, restaurants and lounges, spa, fitness center, and swimming pool.


INTERCONTINENTAL SAN JUAN
San Juan, Puerto Rico


Facility Assessment and MEP/FP Engineering Services were provided for the renovation of the InterContinental San Juan. The InterContinental San Juan includes 398 guest keys, 22 suites, casino, more than 18,000 SF of indoor and outdoor function space, 6 restaurants and lounges, Akua Spa and fitness center, and outdoor swimming pool and whirlpool.